Tuesday, October 27, 2009

PC update

Okay, I heard back from the shop about my PC today. Turns out my power supply isn't powerful enough to run my PC and the huge graphics card I installed a little over a year ago, meaning its been struggling this whole time to keep my computer running and has decided to give up. I will be back up and running as soon as my new power supply arrives.

::UPDATE::

Power supply should arrive on Monday.

Sunday, October 25, 2009

So yeah, all my attempts at fixing my computer have failed, taking it in to the shop tomorrow.

Tuesday, October 20, 2009

Yay for delays

So I've been having a bunch of computer problems lately, got bad enough that I had to completly wipe my hard drive and reinstall Windows. I have all the LA stuff backed up, but I need to reinstall all my programs, including 3DS Max, I should be back up and running in a few days.

Sunday, October 18, 2009

3d Links Awakening Dungeon update 190 - 192

Level 6 - Southern Face Shrine quadrant A3 is complete.



Level 6 - Southern Face Shrine quadrant A2 is complete.



Level 6 - Southern Face Shrine quadrant A1 is complete.



Perspective view (Click for full size)


Top Down view (Click for full size)

3d Links Awakening Interior update 67&68

Cave quadrant M10-N10 A1 is complete.



Cave quadrant M10-N10 B1 is complete.

Tuesday, October 13, 2009

3d Links Awakening Interior update 66

Cave quadrant O11 A1 is complete.

Monday, October 12, 2009

3d Links Awakening Interior update 65

Cave quadrant O11 A1 is complete.

Sunday, October 11, 2009

3d Links Awakening Interior update 62 - 64

Cave quadrant O13-P13 B2 is complete.



Cave quadrant O13-P13 A2 is complete.



Cave quadrant O13-P13 A1 is complete.

3d Links Awakening Interior update 60 - 61

Cave quadrant N13-A1 is complete.



Cave quadrant N13-B1 is complete.

Wednesday, October 7, 2009

3d Links Awakening Interior update 59

Cave quadrant N13-A2 is complete.

Tuesday, October 6, 2009

3d Links Awakening Interior update 58

Cave quadrant N13-B2 is complete.

Monday, October 5, 2009

3d Links Awakening Interior update 57

Interior quadrant M13-2 A1 is complete.

Posting delays

Hey all, sorry for the lack of recent updates, the server move has required more time and effort on my end then I originally thought. I am going to try making at least one quadrant update a day, rather then 5 on Saturday and 5 on Sunday, hopefully I will be able to ramp up production to pre-work levels.

Thank you for your patience, I hope to have a new demo ready by Christmas, but considering my luck with dates I wouldn't put too much hope into that, at the very least there will be a new trailer showing off some more music.